Shentaister CeramicsShentaisterCeramics Request a quote
Quality & documentation

Documentation,
not adjectives.

Any factory can write “high quality” on a quotation. What decides whether a container is accepted is a set of test reports, a dimensional check and a photo record taken before the balance payment clears.

Vitreous china fails in predictable ways: a rough-in that is 10 mm out, a glaze that crazes after two winters, a carton that collapses when a second pallet is stacked on it. Each of those has a test or a check attached to it, and each is cheap to do before shipment and expensive to discover afterwards.

We issue the standard documentation pack with every order and arrange the market-specific certificates on request. Where a listing belongs to the plant rather than to us, we say so and show the certificate holder's name — a buyer who checks will find the documents match.

BodyVitreous china, water absorption ≤ 0.5%
GlazeDouble-glazed, lead and cadmium tested
North AmericaUPC/cUPC listing support, ASME A112.19.2 / CSA B45.1
FlushMaP test reports, 1,000 g media
PackingISTA 1A / 2A drop and stack testing
InspectionIn-line + pre-shipment, photo report per pallet
Third partySGS, BV, TÜV, Intertek on request
Order to vessel

Seven checkpoints

Each one produces a document or a photo you keep. Nothing is verbal.

01

Specification sign-off

Your drawing or sample is checked against the factory drawing. Differences are listed in writing before the PO.

02

Pre-production sample

One piece from the actual production line, photographed with a ruler and the carton it will ship in.

03

In-line inspection

Glaze thickness, dimensions, drain position and flush volume checked while the batch is running, not after it is packed.

04

Pre-shipment inspection

AQL sampling, carton drop test and a photo of every pallet with its shipping mark. Report issued before the balance is requested.

05

Documentation pack

Invoice, packing list, certificate of origin, test reports, fumigation certificate where the destination requires it.

06

Loading supervision

Container photographed empty, half-loaded and sealed, with the seal number recorded on the loading report.

07

After arrival

Breakage or shortage claims are handled against the loading report and the insurance documents, not against photographs taken weeks later.

What we will not do

  • Quote a certification we cannot produce a certificate for.
  • Hide the plant's name when your QA team asks who the certificate holder is.
  • Ship against a drawing that was never confirmed in writing.
  • Report an inspection we did not attend.

Ask for a sample pack

A current test report set, a glaze chip and a carton specification can be couriered before you place a first order. Tell us the destination country so we send the right documents.

Request documents